← Back to projects

Bathroom Remodel

A dated bathroom stripped to the subfloor and rebuilt with hexagon tile, a new vanity, fixtures and fresh walls.

Bathroom Remodel

The challenge

The old floor and fixtures were worn out and the subfloor needed attention before any new tile could go down.

Our solution

We removed the old finishes, prepared and leveled the subfloor, laid hexagon tile, repaired and painted the walls, then installed a new vanity, mirror, toilet and lighting.

Scope of work

  • Demolition
  • Subfloor preparation
  • Hexagon floor tile
  • Wall repair and paint
  • Vanity, mirror and toilet
  • Lighting

Project gallery

Ready to get your home in shape?